top of page

MOULD REMEDIATION

 

There are three basic stages to a mold remediation project:

 

Stage 1 â€“ Identify and remedy the source of water and/or moisture.

 

Stage 2 â€“  Protect all unaffected areas with an air chamber keeping it under negative air pressure* while managing the airflow in order to decrease the spores being released.  

*The negative air machine scrubs the air clean using a HEPA (high efficiency particulate arrestor) filter which removes 97% of particles larger than 3 microns in size.

 

Stage 3 â€“ Completely remove porous materials affected by the mold growth and physically remove the mould from the structure.  Follow protocols to legally dispose of the materials.

 

NOTE:  This section highlights the very basics of mould remediation. Please contact us for specific information or questions.  

bottom of page